2016 heliophysics Small Explorer (SMEX).

2016 heliophysics Small Explorer (SMEX)

 

2016 heliophysics Small Explorer (SMEX)

heliophysics Small Explorer (SMEX) Program Library

This following logged content establishes a record of changes made to the 2016 heliophysics Small Explorer (SMEX) Program Library.
Change Date Change Description
8/25/2017 5. "Guidelines and Criteria for the Phase A Concept Study" (Final), posted.
8/10/2017 NASA Procurement Information Circulars (PICs) may be accessed at http://www.hq.nasa.gov/office/procurement/regs/pic.html. The following NASA Procurement Information Circulars are referenced in this AO. ... PIC 05-15, "Guidance On Competitive Procedures For Broad Agency Announcements" , deleted.
4/26/2017 "NASA and Federal Documents", "NPR 1600.1, NASA Security Program Procedural Requirements", and, "NPR 8000.4A, Risk Management Procedural Requirements", added.
9/30/2016 "21. STP Rideshare User’s Guide (RUG", posted.
9/14/2016 "6. ELV Launch Services Information Summary", Revision C, posted.
8/31/2016 Revision to "ELV Launch Services Information Summary", posted.
8/10/2016 Strategic Documents: "3. Our Dynamic Space Environment: Heliophysics Science and Technology Roadmap for 2014-2033", posted.
8/09/2016 "3. SMall EXplorers (SMEX) Mission Assurance Requirements (MAR), Mission Risk Classification - NPR 7120.5 Class D ", updated.
7/22/2016 "13. Format for Phase A contract budget summary for contracts that exceed $750,000, SMEX Budget Summary, Exhibit A", updated.
7/19/2016 "7. Information on International Space Station Resources", expanded to include "ISS External Payload Proposer's Guide", "ISSP JEM-EF Resource Directive", "Proposer's ISS-Instrument Resource Accommodation Table", "Proposer's Requested ISS Resource Table".
7/19/2016 "7. Information on International Space Station Resources", updated.
7/13/2016 "13. Format for Phase A contract budget summary for contracts that exceed $750,000, SMEX Budget Summary, Exhibit A", posted.
6/10/2016 "3. Mission Assurance Requirements (MAR) - Mission Risk Classification for Small Explorers Class D Payloads" modified to read, "3. Mission Assurance Requirements (MAR) - Mission Risk Classification for Small Explorers Class D Payloads".
6/1/2016 "18. Available Spectrum and Channel Limits By Allocated Service" posted.
5/25/2016 "8. Space Communications and Navigation (SCaN) Mission Operations and Communications Service (MOCS)" modified to read, "8. NASA's Mission Operations and Communications Services".
5/18/2016 Reference to "Table B3a: Total Mission Cost RY$ Funding Profile Template", deleted from "Microsoft Excel version of the template tables in the AO".
5/18/2016 Revision to "ELV Launch Services Information Summary", posted.
5/10/2016 Link to "Explanatory Guide to SMD E/PO Evaluation Factors", posted.
4/27/2016 "Spectrum Data Space Communications" and "S-Band Overview" documents posted a 8a and 8b, respectively.
4/15/2016 Guidance and Expectations for Small Category3, Risk Classification D (Cat3/ClassD) Space Flight Projects with Life Cycle Cost under $150M, posted.
4/15/2016 Technical, Management and Cost Panel Expectations on SMA-Related Program Requirements for NASA Class C and Class D Payloads, Final version posted.
4/5/2016 Space Communications and Navigation (SCaN) Mission Operations and Communications Service (MOCS), Final revison 1 posted.
3/24/2016 Space Communications and Navigation (SCaN) Mission Operations and Communications Service (MOCS), Final version posted.
3/24/2016 NPR 7150.2B, NASA Software Engineering Requirements, version update.
3/24/2016 NPR 8715.3C, NASA General Safety Program Requirements, version update.
3/24/2016 NASA-HDBK-6022, NASA Handbook for the Microbiological Examination of Space Hardware, version update.
10/06/2015 Set-up Library with initial documents.