
| Change Date | Change Description |
|---|---|
| 8/25/2017 | 13. "Guidelines and Criteria for the Phase A Concept Study" (Final), posted. |
| 8/10/2017 | NASA Procurement Information Circulars (PICs) may be accessed at http://www.hq.nasa.gov/office/procurement/regs/pic.html. The following NASA Procurement Information Circulars are referenced in this AO. ...PIC 05-15, "Guidance On Competitive Procedures For Broad Agency Announcements", deleted. |
| 4/26/2017 | "NASA and Federal Documents", "NPR 1600.1, NASA Security Program Procedural Requirements", and, "NPR 8000.4A, Risk Management Procedural Requirements", added. |
| 9/30/2016 | "19. STP Rideshare User’s Guide (RUG", posted. |
| 8/10/2016 | Strategic Documents: "3. Our Dynamic Space Environment: Heliophysics Science and Technology Roadmap for 2014-2033", posted. |
| 8/9/2016 | "3. Mission Assurance Requirements (MAR) - Mission Risk Classification for Small Explorers Class D Payloads", updated. |
| 7/19/2016 | "7. Information on International Space Station Resources", expanded to include "ISS External Payload Proposer's Guide", "ISSP JEM-EF Resource Directive", "Proposer's ISS-Instrument Resource Accommodation Table", "Proposer's Requested ISS Resource Table". |
| 7/19/2016 | "5. Information on International Space Station Resources", updated. |
| 6/10/2016 | "3. Mission Assurance Requirements (MAR) - Mission Risk Classification for Small Explorers Class D Payloads" modified to read, "3. Mission Assurance Requirements (MAR) - Mission Risk Classification for Small Explorers Class D Payloads". |
| 6/1/2016 | "17. Available Spectrum and Channel Limits By Allocated Service" posted. |
| 5/25/2016 | "15. Space Communications and Navigation (SCaN) Mission Operations and Communications Service (MOCS)" modified to read, "15. NASA's Mission Operations and Communications Services". |
| 5/18/2016 | "Table B3a: Total Mission Cost RY$ Funding Profile Template", deleted from "Microsoft Excel version of the template tables in the SALMON-2". |
| 5/10/2016 | Link to "Explanatory Guide to SMD E/PO Evaluation Factors", posted. |
| 4/27/2016 | "Spectrum Data Space Communications" and "S-Band Overview" documents posted a 15a and 15b, respectively. |
| 4/15/2016 | Guidance and Expectations for Small Category3, Risk Classification D (Cat3/ClassD) Space Flight Projects with Life Cycle Cost under $150M, posted. |
| 4/15/2016 | Technical, Management and Cost Panel Expectations on SMA-Related Program Requirements for NASA Class C and Class D Payloads, Final version posted. |
| 4/11/2016 | 10. Microsoft Excel version of the template tables in the SALMON-2: This version includes the “B-4 Inflation Index”. |
| 3/24/2016 | NPR 7150.2B, NASA Software Engineering Requirements, version update. |
| 3/24/2016 | NPR 8715.3C, NASA General Safety Program Requirements, version update. |
| 3/24/2016 | NASA-HDBK-6022, NASA Handbook for the Microbiological Examination of Space Hardware, version update. |
| 10/06/2015 | Set-up Library with initial documents. |