
| Change Date | Change Description |
|---|---|
| 06/29/2016 | 23. Mission Operations and Communications Services, posted and includes "a. NASA's Mission Operations and Communications Services (March 21, 2016, New), NASA's Mission Operations and Communications Services (July 16, 2014)", "b. Spectrum Data Space Communication Bands", and "c. S-Band Overview 2-8GHz" documents. |
| 05/05/2016 | "Small Class D / Cat 3 (Life-Cycle Costs < $150M) NPR 7120.5 Guidance" posted. |
| 05/04/2016 | The latest version of "TMC on Class D pay loads" posted. |
| 04/18/2016 | 2015 NASA New Start Inflation Index for FY 16 Use, posted. |
| 03/25/2016 | Program Specific Documents, #18, Mission Definitions Requirements Agreement (MDRA) Examples posted. |
| 03/15/2016 | Program Specific Documents, #19, Participating Individuals and Institutions posted. |
| 03/14/2016 | Program Level Requirements Examples (NuStar, IBEX) posted. |
| 12/17/2015 | Released the final revision of the Guidelines and Criteria for the Phase A Concept Study. |
| 12/02/2015 | "Sample International Agreement with Belgium for Juno" and "Sample International Agreement with France for MSL", posted. |
| 11/17/2015 | Released the latest revision of the Guidelines and Criteria for the Phase A Concept Study, and soliciting comments. |
| 09/30/2015 | 3. Replaced Mission Assurance Requirements (MAR) documents with one drafted for Small Explorer Class D payloads |
| 10/02/2014 | Revised Caption "3. Explorer Safety, Reliability, and Quality Assurance Requirements, 320-MAR-1001E Standard Mission Assurance Requirements (MAR) |
| 09/24/2014 | Revision 3, "11. Microsoft Excel version of the template tables in the SALMON-2" posted. |
| 09/19/2014 | Revision 2, "11. Microsoft Excel version of the template tables in the SALMON-2" posted. |
| 09/18/2014 | Replaced the "11. Microsoft Excel version of the template tables in the SALMON-2" document. |
| 08/28/2014 | Removed the "Step-One Proposal Evaluation Plan Template" document. |
| Change Log Initialized |